Software Development Life Cycle (SDLC) MCQs for Project Managers

| Reading Time: 3 minutes
Contents

Are you a project manager looking to sharpen your knowledge of the Software Development Life Cycle (SDLC)? Our comprehensive set of multiple-choice questions is designed specifically for professionals like you.

These questions cover essential concepts, methodologies, and best practices within SDLC. You can self-assess yourself by going through this set of questions.

By testing your knowledge, you can identify areas for improvement and ensure you’re well-prepared for top interviews in the field.

Source: Freepik

Software Development Life Cycle

SDLC is a cost-effective and time-saving process used by developers to build and design robust yet eminent software. It mitigates the risk factor for projects by planning forward so that the product meets the customer’s expectations.

This approach is a series of steps that divides the process of software development into tasks. Once the whole lengthy process is divided into minimal tasks, it becomes easier to comprehend, and they can be easily assigned, completed, and then evaluated for results.

SDLC has a range of benefits:

  • Provides visibility to software developers
  • Gives control over the project to business owners
  • Makes sure that the goal is achieved on time and the task is completed on time.
  • Ensures that the budget or the deadline is not exceeded.
  • Customer satisfaction is ensured at all costs.

SDLC MCQs with Answers

The software development lifecycle (SDLC) is a process software development teams use to design, develop, test, deploy, and maintain software.

Project management plays a crucial role in SDLC, ensuring that projects are completed on time and within the allocated budget. They are responsible for resource management, progress monitoring, risk identification, and mitigation.

These questions revolve around SDLC and being a project manager, you should gauge your knowledge before applying to the interviews.

Q1. How many phases are there in SDLC?

  1. 3
  2. 5
  3. 6
  4. 7

Answer: D. 7

Q2. Which of the following is a model of SDLC?

  1. Agile methodology
  2. Waterfall
  3. Both (A) and (B)
  4. None of the above

Answer: C. Both Agile and Waterfall are SDLC models

Q3. How many SDLC models are there?

  1. 2.
  2. 3
  3. 4
  4. 5

Answer: C. 4

Q4. Which of the following practices are used to integrate security?

  1. Bottom-up approach
  2. Top-down approach
  3. Both (A) and (B)
  4. DevSecOps

Answer: D. DevSecOps

Q5. Which of the following is not a phase of SDLC?

  1. Implementation
  2. Design and Prototyping
  3. Deployment
  4. None of the above

Answer: All of the options mentioned above are phases of SDLC

Q6. Which of the following are the benefits of the iterative model?

  1. Revenue Generation
  2. Easier to manage
  3. Equal distribution of workload
  4. All of the above

Answer: D. All of the above

Q7. The testing objective is the same for each phase of the life cycle. Is the statement true or false?

  1. True
  2. False
  3. Maybe
  4. Not sure

Answer: B. False

Q8. SDLC helps in identifying ___________ of software

  1. Omission
  2. Redundancy
  3. Inconsistency
  4. All of the above

Answer: D. All of the above

Q9. SDLC launches the software for __________ testing

  1. Alpha
  2. Beta
  3. Gamma
  4. All of the above

Answer: D. All of the above

Q10. Is SDLC part of ALM?

  1. Yes
  2. No
  3. Maybe
  4. Not sure

Answer: A. Yes

Q11. _________ model emphasizes testing.

  1. V-V model
  2. Spiral model
  3. Waterfall model
  4. None of the above

Answer: A. V-V model

Q12. Which of the following is carried out first in the SDLC model?

  1. Validation
  2. Encryption
  3. Verification
  4. Communication

Answer: C. Verification

Q13. Verification is done by _________

  1. Web developer
  2. Web designer
  3. QA team
  4. Tester

Answer: C. QA team

Q14. Verification focuses mainly on _________

  1. Process
  2. Product
  3. Dataset
  4. All of the above

Answer: A. Process

Q15. Which of the following makes up the requirement analysis?

  1. Customer inputs
  2. Surveys of sales departments or markets
  3. Both (A) and (B)
  4. None of the above

Answer: C. Both (A) and (B)

Q16. The defined requirements need approval from __________

  1. Customers
  2. Market analysts
  3. Stakeholders
  4. All of the above

Answer: D. All of the above

Q17. Which of the following is part of the classic waterfall model?

  1. Feasibility study
  2. Building prototype
  3. Maintenance of software
  4. Requirement Analysis

Answer: B. Building prototype

Q18. In the incremental model, requirements are priorities. Is the statement true or false?

  1. True
  2.  False
  3. Maybe
  4. Not sure

Answer: A. True

Q19. Which of the following is used in developing the product stage of SDLC?

  1. Compilers
  2. Interpreters
  3. Debuggers
  4. All of the above

Answer: D. All of the above

Q20. Is minimal testing done at every stage of SDLC?

  1. Yes
  2. No
  3. Maybe
  4. Not sure

Answer: A. Yes

Q21. What happens to all the probable flaws in the testing stage of SDLC?

  1. Tracked
  2. Fixed
  3. Retested
  4. All of the above

Answer: D. All of the above

Q22. How many types of product testing are done?

  1. 2
  2. 3
  3. 4
  4. 5

Answer: B. 3

Q23. Which of the following is not a type of product testing?

  1. System Testing
  2. Manual Testing
  3. Automated Testing
  4. None of the above

Answer:  D. None of the above

Q24. Which of the following models is not in practice anymore?

  1. Agile model
  2. Waterfall model
  3. Spiral model
  4. V-shaped model

Answer: B. Waterfall model

Q25. Which of the following has an unstructured approach to software development?

  1. V-shaped model
  2. The Big Bang model
  3. Iterative model
  4. Agile model

Answer: B. The Big Bang model

Q26. What is a V-shaped model called?

  1. Validification model
  2. Verification model
  3. Both (A) and (B)
  4. Neither (A) nor (B)

Answer: C. Both (A) and (B)

Q27. __________ model is most appropriate for handling risks

  1. Spiral model
  2. V-shaped model
  3. Agile model
  4. Waterfall model

Answer: A. Spiral model

Expand Your Understanding of SLDC with Interview Kickstart

SDLC is a vital part of the software development process. Thus, having insights from highly experienced mentors will help you crack through interviews and land your dream job. With live training and mock interviews at Interview Kickstart, you are bound to improve your software development skills.

Product Manager interviews often require candidates to navigate challenging questions focused on product strategy, design, and leadership principles. This is where Interview Kickstart enters to help you crack the tough interview questions. If you enroll for the Technical Product Manager Interview Masterclass, you will learn what types of questions are asked at top-tier interviews and how you can crack them.

FAQs: Software Project Management

What do you mean by Agile methodology?
It is a software development that is opted for by most universities and programming bootcamps. It emphasizes:

  • Delivering consistent results to the clients
  • Building a community for skilled people
  • Easy communication
  • To ensure teamwork between the business team and the technical team
  • Assessing the performance of the team and marketing analytics

What is the difference between the Software Development Life Cycle and the Systems Development Lifestyle?
The software development life cycle deals with the development and thorough testing of all the software components.
But System development is a broader term that includes all the processes from setup to management of the software, hardware, and the people that are responsible. It includes all kinds of tasks ranging from organizational training to altering financial and management policies that are not included in the software development category.

What are the disadvantages of SDLC?
SDLC comes with certain drawbacks:

  • SDLC is highly time-consuming due to its complexity
  • SDLC is inflexible to changes during the development process
  • It is costly as it requires investment in terms of money, time and resources.
  • It focuses too much on the development process rather than the end product.

What are some prominent methodologies of the software development life cycle?
Agile, BizDevSecOps, Continuous Delivery, Evolutionary Architecture + Agile, Kanban, Lean, and Scrum are some of the prominent approaches of SLDC.

Your Resume Is Costing You Interviews

Top engineers are getting interviews you’re more qualified for. The only difference? Their resume sells them — yours doesn’t. (article)

100% Free — No credit card needed.

Register for our webinar

Uplevel your career with AI/ML/GenAI

Loading_icon
Loading...
1 Enter details
2 Select webinar slot
By sharing your contact details, you agree to our privacy policy.

Select a Date

Time slots

Time Zone:

Java Float vs. Double: Precision and Performance Considerations Java

.NET Core vs. .NET Framework: Navigating the .NET Ecosystem

How We Created a Culture of Empowerment in a Fully Remote Company

How to Get Remote Web Developer Jobs in 2021

Contractor vs. Full-time Employment — Which Is Better for Software Engineers?

Coding Interview Cheat Sheet for Software Engineers and Engineering Managers

Ready to Enroll?

Get your enrollment process started by registering for a Pre-enrollment Webinar with one of our Founders.

Next webinar starts in

00
DAYS
:
00
HR
:
00
MINS
:
00
SEC

Register for our webinar

How to Nail your next Technical Interview

Loading_icon
Loading...
1 Enter details
2 Select slot
By sharing your contact details, you agree to our privacy policy.

Select a Date

Time slots

Time Zone:

Get tech interview-ready to navigate a tough job market

Best suitable for: Software Professionals with 5+ years of exprerience
Register for our FREE Webinar

Next webinar starts in

00
DAYS
:
00
HR
:
00
MINS
:
00
SEC